The first design step for a concrete bridge deck is to choose the correct design criteria. Table of Contents Design Step 2.1 - Obtain Design Criteriaĭesign Step 2.2 - Determine Minimum Slab Thicknessĭesign Step 2.3 - Determine Minimum Overhang Thicknessĭesign Step 2.4 - Select Slab and Overhang Thicknessĭesign Step 2.5 - Compute Dead Load Effectsĭesign Step 2.6 - Compute Live Load Effectsĭesign Step 2.7 - Compute Factored Positive and Negative Design Momentsĭesign Step 2.8 - Design for Positive Flexure in Deckĭesign Step 2.9 - Check for Positive Flexure Cracking under Service Limit Stateĭesign Step 2.10 - Design for Negative Flexure in Deckĭesign Step 2.11 - Check for Negative Flexure Cracking under Service Limit Stateĭesign Step 2.12 - Design for Flexure in Deck Overhangĭesign Step 2.13 - Check for Cracking in Overhang under Service Limit Stateĭesign Step 2.14 - Compute Overhang Cut-off Length Requirementĭesign Step 2.15 - Compute Overhang Development Lengthĭesign Step 2.16 - Design Bottom Longitudinal Distribution Reinforcementĭesign Step 2.17 - Design Top Longitudinal Distribution Reinforcementĭesign Step 2.18 - Design Longitudinal Reinforcement over Piersĭesign Step 2.19 - Draw Schematic of Final Concrete Deck Design LRFD Steel Girder SuperStructure Design Example Concrete Deck Design Example Design Step 2
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |